ZEMERC Engineering Deliverables Studio

Engineering deliverables, built from the project's own evidence.

EDS reads your drawings, specifications, registers and contract appendices, builds a verified engineering model of the plant, and produces controlled deliverables in which every technical statement names the document, revision and page it came from.

EDS engineering pipeline
  1. Ingest

    P&IDs, line lists, specs, P6

    01
  2. Extract

    OCR, tables, drawing entities

    02
  3. Relate

    Assets, systems, requirements

    03
  4. Generate

    Cited sections and tables

    04
  5. Issue

    Reviewed, approved, controlled

    05
Every statement produced carries the document, revision, page and region it came from.

The problem

Engineering teams retype what the project already knows.

Tag numbers, line sizes, test pressures and clause references already exist in the project package. They are re-entered by hand into every procedure, ITP, plan and register, and every re-entry is a chance to be wrong.

Documents in the reference project this deployment holds
25
Disciplines with deliverable generation, of those catalogued
4 of 16
Statements that must cite a source
100%
Values EDS may invent
0

The document count is the ZEMERC synthetic reference project, not a customer installation and not an industry average. This project is the ZEMERC synthetic reference dataset. The documents, registers and records are real files generated from a declared model; no figure in them describes any real facility, and nothing written here is persisted.

How it works

From a package of drawings to a controlled deliverable.

  1. 1

    Ingest the package

    Upload the scope, drawings, registers, specifications and schedule. Originals are stored unchanged and never overwritten.

  2. 2

    Build the engineering model

    Extraction proposes tags, lines and relationships with a confidence on every value; engineers verify what matters.

  3. 3

    Produce and issue

    Choose a deliverable, approve its outline, generate cited content, resolve gaps, review, approve and issue DOCX and PDF.

Assurance

Built for accountable engineering.

No invented engineering values

A missing pressure basis is a recorded gap that blocks approval, not a plausible number. Uncertainty is preserved all the way to the issued document.

Evidence or an author, never neither

Every asserted fact carries its document, revision, page and region, with a confidence and a verification state, or the name of the engineer who entered it.

Isolation enforced in the database

Row-level security on every tenant-scoped table, tenant-scoped storage, and time-boxed audited support access that can read but never write.

Multi-tenant SaaSCustomer cloudOn-premisesAudited support access

Deliverable coverage

The documents engineering actually issues.

Deliverable types supported across disciplines
DisciplineTypical deliverables
ProcessPhilosophies, calculations, operating instructions
PipingHydrotest procedures, ITPs, work packs
InstrumentationLoop check procedures, calibration plans
ElectricalInstallation specifications, test plans
CommissioningCommissioning and start-up plans, handover dossiers
HSE and qualityRisk assessments, inspection and test plans

See EDS against your own package.

Bring a scanned P&ID, a line list and a contract appendix. We will show ingestion, extraction, verification and a generated deliverable with its citations.