Coverage
Every engineering discipline, not commissioning alone
EDS carries 16 discipline groups, 4 deliverable types and a symbol taxonomy of 18 entries. The lists below are the application's own catalogues, not a brochure.
The discipline catalogue
Read from the catalogue the project setup form offers. A marketing list that drifts from the product is how a sales claim and an application come to disagree.
| Code | Discipline | What it is responsible for | Deliverable generation | Symbols recognised |
|---|---|---|---|---|
| PRO | Process | Process design, operating philosophy, heat and mass balance, and the technical basis the plant is built to. | 1 type | 0 |
| MEC | Mechanical | Rotating and static equipment, its installation, alignment and mechanical completion. | 1 type | 0 |
| PIP | Piping | Piping design, materials, supports, pressure testing, flushing and reinstatement. | 1 type | 0 |
| ELE | Electrical | Power distribution, installation, earthing, energisation and electrical testing. | Documents and registers | 0 |
| INS | Instrumentation and control | Field instruments, loops, control systems, calibration and functional testing. | Documents and registers | 0 |
| CIV | Civil and structural | Foundations, structures, buildings, drainage and the inspection of them. | Documents and registers | 0 |
| CON | Construction | Executing the work on site: sequence, method, resources and temporary works. | Documents and registers | 0 |
| PLN | Planning | Schedule development, progress measurement, reporting and the critical path. | Documents and registers | 0 |
| CST | Cost | Cost control, forecasting, change control and cost reporting. | Documents and registers | 0 |
| QUA | Quality | Quality planning, inspection and test plans, non-conformance and verification records. | 1 type | 0 |
| HSE | Health, safety and environment | Risk assessment, permits, emergency response and environmental obligations. | Documents and registers | 0 |
| COM | Commissioning | System completion, pre-commissioning, commissioning, start-up preparation and handover. | Documents and registers | 0 |
| OPS | Operations | Operating procedures, operational readiness and the operator's own documentation. | Documents and registers | 0 |
| MNT | Maintenance | Maintenance strategy, inspection plans, spares and the maintainable asset record. | Documents and registers | 0 |
| PRC | Procurement | Technical requisitions, vendor document requirements, inspection at source and expediting. | Documents and registers | 0 |
| PMG | Project management | Execution planning, interfaces, deliverable control and technical management. | Documents and registers | 0 |
Where coverage is thin, and said to be
Document management, extraction and registers work across every discipline. Deliverable generation does not yet.
Generation available
- ProcessEngineering calculation
- MechanicalMethod statement
- PipingHydrotest procedure
- QualityInspection and test plan
Documents and registers only
12 disciplines. Their documents are read, their tags extracted and their registers built; no deliverable type has been written for them yet.
- ELEElectrical
- INSInstrumentation and control
- CIVCivil and structural
- CONConstruction
- PLNPlanning
- CSTCost
- HSEHealth, safety and environment
- COMCommissioning
- OPSOperations
- MNTMaintenance
- PRCProcurement
- PMGProject management
Tell us which disciplines matter on your project
Deliverable types are written per discipline, and the order they are written in is a decision we would rather make with you than for you.