System configuration
Hierarchy types, disciplines, deliverable types and thresholds - and the rules that are not configurable.
Demonstration project - no figure here describes a real facilityChanges are not saved
Why
The catalogues below are the ones the application actually uses. Nothing here is a placeholder list.
Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.
Disciplines
16
Deliverable types
4
Hierarchy types
4
Rules an administrator can weaken
0
Some things are deliberately not configurable
Raising the OCR confidence ceiling would not make a scan easier to read. It would make every reading from a scan look more trustworthy than it is.
Configurable
Not configurable, and why
| Rule | Why it is fixed |
|---|---|
| Confidence ceilings per reading method | A property of the method. Raising it changes how trustworthy a reading looks, not how good it is. |
| The author may not approve their own work | Approval is the point at which somebody becomes answerable. |
| A disputed value presents no value | A number nobody can stand behind must not reach a deliverable. |
| Only the reviewer who raised a comment may close it | Otherwise a review is a formality. |
| A draft watermark cannot be removed before approval | An unapproved document that looks issued is the one most likely to be used as though it were. |
| Evidence cannot be edited | A reading can be superseded; rewriting one makes the audit trail fiction. |
Reading methods and their ceilings
| Method | Engine | Ceiling | |
|---|---|---|---|
| native_text | pdf-native | 80% | Fixed |
| ocr | eds-stroke-ocr | 60% | Fixed |
| both | pdf-native+eds-stroke-ocr | 70% | Fixed |
| structured | xlsx-reader | 100% | Fixed |
| none | none | 0% | Fixed |
Disciplines
| Code | Discipline |
|---|---|
| PRO | Process |
| MEC | Mechanical |
| PIP | Piping |
| ELE | Electrical |
| INS | Instrumentation and control |
| CIV | Civil and structural |
| CON | Construction |
| PLN | Planning |
| CST | Cost |
| QUA | Quality |
| HSE | Health, safety and environment |
| COM | Commissioning |
| OPS | Operations |
| MNT | Maintenance |
| PRC | Procurement |
| PMG | Project management |