Schedule and activities

The imported schedule, what each activity is linked to, and how strong that link is.

Demonstration project - no figure here describes a real facilityChanges are not saved
Why

Percent complete is as the schedule states it. It is never combined with deliverable or verification state: those are different facts about the same work.

Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.

Activities

12

Critical

8

Complete

0

Not started

6

Schedule activities (12)
ActivityNameWindowAs plannedDisciplineLinked to
A1000Detailed design - condensate export2026-06-01 to 2026-11-30
72%72%
PROnothing
A1010P&ID development2026-06-01 to 2026-10-28
95%95%
PROnothing
A1020Line list and piping material selection2026-07-15 to 2026-10-22
88%88%
PIPZRF-HTP-0015matched on discipline - a guess, not a traced link
A1030Equipment datasheets2026-08-01 to 2026-11-14
64%64%
MECnothing
A1040Instrument index and datasheets2026-08-15 to 2026-11-28
55%55%
INSZRF-LCR-0021matched on discipline - a guess, not a traced link
A1050Electrical single line diagrams2026-09-01 to 2026-12-12
40%40%
ELEZRF-ETR-0004matched on discipline - a guess, not a traced link
A2000Construction - condensate export2026-12-01 to 2027-06-30
0%0%
CONnothing
A2010Piping fabrication and installation2026-12-01 to 2027-04-30
0%0%
PIPZRF-HTP-0015matched on discipline - a guess, not a traced link
A2020Pressure testing and reinstatement2027-03-15 to 2027-05-28
0%0%
PIPZRF-HTP-0015matched on discipline - a guess, not a traced link
A3000Commissioning - condensate export2027-05-01 to 2027-08-31
0%0%
COMZRF-CMP-0007matched on discipline - a guess, not a traced link
A3010Loop checking2027-05-01 to 2027-06-15
0%0%
INSZRF-LCR-0021matched on discipline - a guess, not a traced link
A4000Handover2027-09-01 to 2027-09-30
0%0%
COMZRF-CMP-0007matched on discipline - a guess, not a traced link

Progress is not combined with anything

An activity reported ninety-five per cent complete by a planner and a deliverable with an open blocking comment are two different facts about the same work. Averaging them produces a number that is true of neither.
The links are weak, and said to be

An activity is matched to deliverables by discipline. That is a guess: an activity named “P&ID development” probably relates to the process deliverables, and nothing in the schedule says so. Presenting it as a traced relationship would be inventing a link the data does not contain.

Test packs

  • ZRF-TP-001Not linked to an activity
  • ZRF-TP-002Not linked to an activity

No activity names a test pack, so no link exists. Why