Document library

Every source document the project holds, with its current revision, how EDS read it, and how many tags it carries.

Demonstration project - no figure here describes a real facilityChanges are not saved
Why

Rows, counts, filters and sorting are computed from the project's document records and the files themselves.

Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.

Documents

25

Drawings

9

Registers

5

Read by EDS

22

Refused or not read

2

1 refused

Document library (25)
NumberascendingTitleClassRevRead
ZRF-CTR-APX-A
Contract Appendix A - Scope of Work
Contract appendix0ReadOpen
ZRF-CTR-APX-D
Contract Appendix D - Quality and Inspection Requirements
Contract appendix0ReadOpen
ZRF-CTR-APX-F
Contract Appendix F - Documentation and Deliverables
Contract appendix0Not readOpen
ZRF-DS-P-1201A
Equipment Datasheet - Condensate Export Pump P-1201A
DatasheetBReadOpen
ZRF-DS-PSV-1210
Relief Device Datasheet - PSV-1210
DatasheetAReadOpen
ZRF-DS-PT-1201
Instrument Datasheet - Pressure Transmitter PT-1201
DatasheetAReadOpen
ZRF-PFD-1100
PFD - Inlet Reception
PFDAReadOpen
ZRF-PFD-1200
PFD - Condensate Export
PFDBReadOpen
ZRF-PID-1101
P&ID - Inlet Separation (scanned)
P&IDBReadOpen
ZRF-PID-1201
P&ID - Condensate Export Pumps and Discharge
P&IDC3ReadOpen
ZRF-PID-1202
P&ID - Condensate Export Metering
P&IDBReadOpen
ZRF-PID-3101
P&ID - Cooling Water Circulation (mixed)
P&IDAReadOpen
ZRF-PID-3201
P&ID - Instrument Air and Nitrogen
P&IDAReadOpen
ZRF-PID-9001
P&ID - Flare Header (unreadable scan)
P&IDARefusedOpen
ZRF-REG-CS-001
Cable Schedule
Cable scheduleBReadOpen
ZRF-REG-EQ-001
Equipment Register
Equipment listC1ReadOpen
ZRF-REG-II-001
Instrument Index
Instrument indexC1ReadOpen
ZRF-REG-LL-001
Piping Line List
Line listC2ReadOpen
ZRF-REG-MDR-001
Master Document Register
ScheduleC3ReadOpen
ZRF-REG-VR-001
Valve Register
Valve registerC1ReadOpen
ZRF-SCH-0001
Project Schedule - Detailed Design and Construction
ScheduleC4ReadOpen
ZRF-SLD-6001
Single Line Diagram - Utilities MCC
Single line diagramAReadOpen
ZRF-SPC-3300
Piping Material and Pressure Testing Specification
SpecificationC1ReadOpen
ZRF-SPC-4100
Instrumentation and Control Specification
SpecificationBReadOpen
ZRF-VND-P-1201
Vendor Manual - Condensate Export Pump
Vendor manual0QueuedOpen

Showing 1 to 25 of 25 documents

Page 1 of 1

References the project cannot follow

ZRF-PID-1299 is named by a document the project holds and is not in the library. A continuation that leads nowhere is a gap in the drawing set, not a defect in the drawing that names it.

Refused is not the same as unread

A document EDS refused is one it measured as unreadable and declined to guess at. A document not read is one nothing has been attempted on. Both show zero tags, and treating them the same hides the only one of the two that needs a new file.

What a revision means here

The revision shown is the current one. Earlier revisions are kept and are reachable from each document, because an engineer who cites a drawing cites a revision of it, and a library that only holds the latest cannot tell them what has changed underneath.