Document issue register

What has been issued, for what purpose, to whom, and whether it was acknowledged.

Demonstration project - no figure here describes a real facilityChanges are not saved
Why

Nothing has been issued from this project: no transmittal has been created, because no controlled PDF has been produced.

Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.

Approved for issue

2

Transmittals sent

0

Acknowledged

0

Received for construction

8

A transmittal sent is not a document received

A drawing issued for construction that nobody on site acknowledged is a drawing nobody on site has, and the first anybody knows is when the wrong revision is built. The acknowledgement column stays empty until somebody confirms receipt.

Issued by this project

Issued deliverables
DocumentTitleRevApproved byPurpose of issueTransmittalAcknowledged
ZRF-ITP-0003Inspection and Test Plan - Piping FabricationAR. Haddadapproved, not issuednone createdNot acknowledged
ZRF-PEP-0001Project Execution PlanC1R. HaddadFor constructionnone createdNot acknowledged

Received by this project for construction

Source documents issued to the project, which is the other half of the flow.

Documents received for construction
DocumentTitleRevIssuedApproved by
ZRF-PID-1201P&ID - Condensate Export Pumps and DischargeC32026-10-24R. Haddad
ZRF-PID-1202P&ID - Condensate Export MeteringB2026-10-28R. Haddad
ZRF-PID-1101P&ID - Inlet Separation (scanned)B2026-06-18R. Haddad
ZRF-REG-EQ-001Equipment RegisterC12026-10-20not approved
ZRF-REG-LL-001Piping Line ListC22026-10-22not approved
ZRF-REG-II-001Instrument IndexC12026-10-21not approved
ZRF-REG-VR-001Valve RegisterC12026-10-21not approved
ZRF-REG-CS-001Cable ScheduleB2026-10-15not approved

No approver recorded is shown as the fact it is. Why