Approval
What is waiting for approval, what blocks each one, and who may give it.
Demonstration project - no figure here describes a real facilityChanges are not saved
Why
Every refusal is checked in the page, again in the write service, and again by a database constraint.
Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.
Awaiting approval
3
Approvable now
1
Blocked
2
Approvals recorded
2
The author may not approve their own work
Every other rule on this page stops a specific mistake. This one exists because approval is the point at which somebody becomes answerable for a document, and a signature on your own work is not an attestation.
Awaiting approval
| Deliverable | Title | Author | Checker | Approver | What blocks it |
|---|---|---|---|---|---|
| ZRF-CMP-0007 | Commissioning Procedure - Cooling Water System 31 | J. Novak | S. Lindqvist | none assigned |
|
| ZRF-HTP-0015 | Hydrotest Procedure - Condensate Export System 12 | A. Rahman | N. Okonkwo | none assigned |
|
| ZRF-ITP-0008 | Inspection and Test Plan - Condensate Export Piping Supports | N. Okonkwo | A. Rahman | R. Haddad | Nothing |
Approvals recorded
| Deliverable | By | Attestation |
|---|---|---|
| ZRF-ITP-0003 | R. Haddad | Checked by A. Rahman, reviewed by S. Lindqvist, no blocking findings outstanding. |
| ZRF-PEP-0001 | R. Haddad | Reviewed by the Company representative; Appendix F gap recorded and accepted. |
Approve
What is refused
- The author approving their own deliverable
- Approval while an input gap is open
- Approval while a blocking comment is open
- Approval by somebody without the approver capability
- An attestation that says nothing
- Approval with no independent check behind it
Administering is not authority
Approval needs the capability, granted by name. Why