Menu

ZRF-HTP-0015 Hydrotest Procedure - Condensate Export System 12

HTP for PIP, revision B, in review.

Demonstration project - no figure here describes a real facilityChanges are not saved
Why

The gaps, the people and the blockers are read from the project's own records. No section text is generated: no AI provider has been activated.

Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.

This can be drafted and cannot be approved

  • open gap: Approved test pressure basis: the design pressure of P-1201A is in conflict between the datasheet and the line list
  • open blocking comment: The test pressure basis cites the line list, which states 26 barg, while the datasheet for P-1201A states 24 barg. The derived test pressure cannot be stated until this is resolved.
  • open blocking comment: Acceptance criteria state a 2 hour hold. Appendix D requires the hold to be witnessed; the procedure does not say who witnesses it or what they sign.

Drafting and approving are deliberately separate.

Gaps in the draft

A required input the project does not hold. The draft shows a gap where the content would be.

  • Approved test pressure basis: the design pressure of P-1201A is in conflict between the datasheet and the line list

What this rests on

The documents the draft is written from.

Source documents
DocumentTitleRead
ZRF-PID-1201P&ID - Condensate Export Pumps and DischargeRead
ZRF-REG-LL-001Piping Line ListRead
ZRF-SPC-3300Piping Material and Pressure Testing SpecificationRead
ZRF-CTR-APX-AContract Appendix A - Scope of WorkRead

Requirements this must satisfy

What the contract and the specifications ask of this deliverable.

Requirements
ReferenceWhat it requires
REQ-A-014
The hydrostatic test pressure shall be not less than 1.5 times the design pressure of the line under test.
Accepted
REQ-S-3300-18
The test medium shall be filtered potable water with a chloride content of not more than 30 ppm.
Accepted
REQ-S-3300-22
The test pressure shall be held for not less than 2 hours with no visible leakage and no pressure loss.
Accepted
REQ-D-011
Pressure testing shall be witnessed by the Company representative and the record signed before reinstatement.
Not accepted
REQ-ISO-15649-9
Pressure testing requirements for piping systems. Clause text not reproduced: no licensed copy is held.
Not accepted

Review comments

Comments
SectionSeverityCommentResponse
6 ProcedureTechnicalThe vent sequence appears to be missing between steps 6.4 and 6.5.Withdrawn: the vent is in 6.3 and I had read the steps out of order. No change needed.withdrawn
5.1BlockingThe test pressure basis cites the line list, which states 26 barg, while the datasheet for P-1201A states 24 barg. The derived test pressure cannot be stated until this is resolved.Agreed. Raised as a reconciliation item against P-1201A; the section now states the gap.answered
6.1TechnicalThe isolation list includes HV-1202, which is on the header and outside the test boundary for SYS-12-01.Removed from the isolation list at Rev B.closed
9BlockingAcceptance criteria state a 2 hour hold. Appendix D requires the hold to be witnessed; the procedure does not say who witnesses it or what they sign.not answeredopen

Who is on it

Author
A. Rahman
Checker
N. Okonkwo
Reviewer
S. Lindqvist
Approver
none assigned

The author may not be the checker or the approver. Why

Raise a comment

A comment is raised in your name and only you can close it once it is answered.

No section text is generated

Generation needs an AI provider, and none has been activated. The structure, the required inputs, the gaps and the requirement set are all computed; the prose is not written, and the page does not show a draft nobody produced.