Menu

Area and system breakdown

The physical plant, area by area, with what sits in each unit and what has no commissioning system yet.

Demonstration project - no figure here describes a real facilityChanges are not saved
Why

Item counts are the assets actually placed in each node, and the unplaced count is computed rather than recorded.

Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.

Areas

3

Units

6

Items placed

50

Without a subsystem

14

An item with no system is not a data-entry gap

It is an item nobody has decided how to commission. Left alone it is found at the walkdown, when the test packs are already written.

A-10 Inlet and reception

In plant ZRF-P1.

Units in A-10
UnitNameItemsSubsystems reachedNo subsystem
U-11Inlet separation7none7
U-12Condensate export28SYS-12-01, SYS-12-02, SYS-31-010

A-20 Liquefaction

In plant ZRF-P1.

Units in A-20
UnitNameItemsSubsystems reachedNo subsystem
U-21Main cryogenic exchange0none0

A-30 Utilities

In plant ZRF-P1.

Units in A-30
UnitNameItemsSubsystems reachedNo subsystem
U-31Cooling water8SYS-31-010
U-32Instrument air and nitrogen5none5
U-33Electrical distribution2none2

Items with no commissioning system

Items without a subsystem
TagDescriptionUnit
V-1110Inlet separatorU-11No subsystem
K-1120Inlet booster compressorU-11No subsystem
PT-1101Inlet separator pressureU-11No subsystem
LT-1110Inlet separator levelU-11No subsystem
AT-1105Inlet gas H2S analyserU-11No subsystem
PSV-1110Inlet separator relief valveU-11No subsystem
11-NG-1101-300-B2BInlet gas to separatorU-11No subsystem
K-3201Instrument air compressorU-32No subsystem
V-3210Instrument air receiverU-32No subsystem
PT-3201Instrument air header pressureU-32No subsystem
HV-3201Instrument air header isolationU-32No subsystem
32-IA-3201-80-C1CInstrument air headerU-32No subsystem
MCC-6001Utilities motor control centreU-33No subsystem
TX-6010Utilities distribution transformerU-33No subsystem