V-1110 Inlet separator
equipment in U-11.
Not verified
Demonstration project - no figure here describes a real facilityChanges are not saved
Why
Each attribute carries the reading behind it. An attribute two documents dispute shows both rather than the more confident one.
Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.
Attributes
| Attribute | Value | |
|---|---|---|
| type | Vertical separator | Unverified |
| design pressure | 96 barg | Unverified |
| design temperature | 65 degC | Unverified |
| material | SA516 Gr 70 clad | Unverified |
| relief device | PSV-1110 | Unverified |
Evidence
Every reading of this tag, with the parser and confidence behind it.
| Parser | As read | Confidence |
|---|---|---|
| eds-stroke-ocr | V-1110 | 60%Unverified |
| pdf-native | V-1110 | 80%Unverified |
| xlsx-reader | V-1110 | 100%Unverified |
Documents
| Document | Title |
|---|---|
| ZRF-PID-1101 | P&ID - Inlet Separation (scanned) |
| ZRF-PFD-1100 | PFD - Inlet Reception |
| ZRF-REG-EQ-001 | Equipment Register |
Placement
- Tag
- V-1110
- Class
- equipment
- Discipline
- MEC
- Unit
- U-11
- Subsystem
- Not established
- Test pack
- Not assigned
- Drawn on
- ZRF-PID-1101, ZRF-PFD-1100
What this record rests on
- Confidence
- 60%Unverified
- Readings
- 3
- Verified
- Not yet
The weakest link in the chain, not an average. Why
What stops this being used
- nothing machine-read is verified until a person has checked it