Plant hierarchy

Four structures over the same assets. They deliberately do not line up, and the page keeps them apart.

Demonstration project - no figure here describes a real facilityChanges are not saved
Why

Each tree is built from the project's own hierarchy nodes, and the item counts are the assets actually placed in each node.

Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.

Physical plant

11

nodes

Commissioning systems

5

nodes

Test packs

2

nodes

Handover packages

2

nodes

Physical plant

Site, plant, area and unit: where things physically are.

  • ZRFReference LNG Terminalsiteno items
    • ZRF-P1LNG Train 1 and utilitiesplantno items
      • A-10Inlet and receptionareano items
        • U-11Inlet separationunit7 items
        • U-12Condensate exportunit28 items
      • A-20Liquefactionareano items
        • U-21Main cryogenic exchangeunitno items
      • A-30Utilitiesareano items
        • U-31Cooling waterunit8 items
        • U-32Instrument air and nitrogenunit5 items
        • U-33Electrical distributionunit2 items

Items in U-12

Every asset placed in this node, whichever hierarchy placed it.

Assets in U-12
TagDescriptionClass
P-1201ACondensate export pump AequipmentUnverified
P-1201BCondensate export pump B (spare)equipmentUnverified
V-1210Condensate surge drumequipmentVerified
E-1216Condensate export coolerequipmentUnverified
F-1205Condensate export strainerequipmentUnverified
PT-1201Condensate export discharge pressureinstrumentUnverified
PT-1202Condensate export header pressureinstrumentUnverified
TT-1203Condensate export temperatureinstrumentUnverified
LT-1210Surge drum levelinstrumentUnverified
LIC-1210Surge drum level controllerinstrumentUnverified
FT-1204Condensate export flowinstrumentUnverified
PSH-1201Condensate export high pressure switchinstrumentUnverified
HV-1201Condensate export discharge isolationvalveUnverified
HV-1202Condensate export header isolationvalveUnverified
LCV-1210Surge drum level control valvevalveUnverified
PSV-1210Surge drum relief valvevalveUnverified
CV-1201Condensate export pump A non-returnvalveUnverified
XV-1205Condensate export shutdown valvevalveUnverified
12-CD-1201-150-A1ACondensate export pump A dischargelineUnverified
12-CD-1202-150-A1ACondensate export headerlineUnverified
12-CD-1203-100-A1ASurge drum level control linelineUnverified
12-CW-1210-100-C1CCooling water supply to condensate export coolerlineUnverified
M-1201ACondensate export pump A motorequipmentUnverified
M-1201BCondensate export pump B motorequipmentUnverified
C-60101MCC-6001 to M-1201A power cablecableUnverified
C-60102MCC-6001 to M-1201B power cablecableUnverified
C-60201Instrument multicore to JB-1201cableUnverified
E-1217Condensate export cooler B (register only, drawn on no sheet)equipmentUnverified

U-12 in the other structures

The same items, placed by each hierarchy in turn. Where a node's items land in more than one place, the structures disagree about this node.

Commissioning systemsspans 3

Test packsspans 2

Four structures, never merged

Test packs that span units

Ordinary, and the reason a single tree cannot express this project.

  • ZRF-TP-002U-31, U-12

Where a boundary comes from

A drawn boundary is never an approved one. Why