Plant hierarchy
Four structures over the same assets. They deliberately do not line up, and the page keeps them apart.
Why
Each tree is built from the project's own hierarchy nodes, and the item counts are the assets actually placed in each node.
Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.
Physical plant
11
nodes
Commissioning systems
5
nodes
Test packs
2
nodes
Handover packages
2
nodes
Commissioning systems
System and subsystem: how the plant is commissioned, which does not follow the physical layout.
Items in SYS-12-02
Every asset placed in this node, whichever hierarchy placed it.
| Tag | Description | Class | |
|---|---|---|---|
| E-1216 | Condensate export cooler | equipment | Unverified |
| PT-1202 | Condensate export header pressure | instrument | Unverified |
| TT-1203 | Condensate export temperature | instrument | Unverified |
| FT-1204 | Condensate export flow | instrument | Unverified |
| HV-1202 | Condensate export header isolation | valve | Unverified |
| XV-1205 | Condensate export shutdown valve | valve | Unverified |
| 12-CD-1202-150-A1A | Condensate export header | line | Unverified |
| E-1217 | Condensate export cooler B (register only, drawn on no sheet) | equipment | Unverified |
SYS-12-02 in the other structures
The same items, placed by each hierarchy in turn. Where a node's items land in more than one place, the structures disagree about this node.
Physical plant
- U-128 items
Test packs
- ZRF-TP-0012 items
- not placed6 items
Four structures, never merged
Test packs that span units
Ordinary, and the reason a single tree cannot express this project.
- ZRF-TP-002U-31, U-12
Where a boundary comes from
A drawn boundary is never an approved one. Why