Plant hierarchy

Four structures over the same assets. They deliberately do not line up, and the page keeps them apart.

Demonstration project - no figure here describes a real facilityChanges are not saved
Why

Each tree is built from the project's own hierarchy nodes, and the item counts are the assets actually placed in each node.

Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.

Physical plant

11

nodes

Commissioning systems

5

nodes

Test packs

2

nodes

Handover packages

2

nodes

Commissioning systems

System and subsystem: how the plant is commissioned, which does not follow the physical layout.

  • SYS-12Condensate export systemsystemno items
    • SYS-12-01Export pumps and dischargesubsystem19 items
    • SYS-12-02Export meteringsubsystem8 items
  • SYS-31Cooling water systemsystemno items
    • SYS-31-01Cooling water circulationsubsystem9 items

Items in SYS-31-01

Every asset placed in this node, whichever hierarchy placed it.

Assets in SYS-31-01
TagDescriptionClass
P-3101ACooling water pump AequipmentUnverified
P-3101BCooling water pump BequipmentUnverified
T-3110Cooling water buffer tankequipmentUnverified
PT-3101Cooling water header pressureinstrumentUnverified
TT-3102Cooling water supply temperatureinstrumentUnverified
HV-3101Cooling water pump A isolationvalveUnverified
12-CW-1210-100-C1CCooling water supply to condensate export coolerlineUnverified
31-CW-3101-400-C1CCooling water supply headerlineUnverified
31-CW-3102-400-C1CCooling water return headerlineUnverified

SYS-31-01 in the other structures

The same items, placed by each hierarchy in turn. Where a node's items land in more than one place, the structures disagree about this node.

Physical plantspans 2

Test packs

Four structures, never merged

Test packs that span units

Ordinary, and the reason a single tree cannot express this project.

  • ZRF-TP-002U-31, U-12

Where a boundary comes from

A drawn boundary is never an approved one. Why