Line list
The piping line list, with size, class, design conditions and test pressure.
Why
The rows, the counts, the confidence and the refusal to verify a disputed value are all computed from the project's documents and their evidence.
Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.
Line list
8
Verified by a person
0
Not yet verified
8
Nothing machine-read is verified
Blocked by a conflict
1
| Tagdescending | Description | Assurance | |
|---|---|---|---|
| 32-IA-3201-80-C1C | Instrument air header | Unverified80% | |
| 31-CW-3102-400-C1C | Cooling water return header | Unverified70% | |
| 31-CW-3101-400-C1C | Cooling water supply header | Unverified70% | |
| 12-CW-1210-100-C1C | Cooling water supply to condensate export cooler | Unverified80% | |
| 12-CD-1203-100-A1A | Surge drum level control line | Unverified80% | |
| 12-CD-1202-150-A1A | Condensate export header | Unverified80% | |
| 12-CD-1201-150-A1A | Condensate export pump A discharge | Blocked50% | |
| 11-NG-1101-300-B2B | Inlet gas to separator | Unverified60% |
Showing 1 to 8 of 8 lines
Nothing machine-read is verified
Verify one
Where a value comes from
A register row is only as good as the reading behind it. The confidence shown is the weakest link in that chain, not an average: a value read from three documents is as trustworthy as the worst of the three readings, and averaging would let two confident readings hide one bad one.