Requirements are read from the project's specifications and contract appendices. A clause from an unlicensed standard is cited and never reproduced.
Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.
Requirements
9
Mandatory
8
Suggested by the model
1
never verified on arrival
Accepted
6
In conflict
1
| Reference | Requirement | Source | Class | |
|---|---|---|---|---|
| REQ-S-3300-18 | The test medium shall be filtered potable water with a chloride content of not more than 30 ppm. | ZRF-SPC-3300 | mandatory | Accepted |