Menu

Requirements extraction

Every requirement the project has extracted, with its source, its classification and whether anybody has accepted it.

Demonstration project - no figure here describes a real facilityChanges are not saved
Why

Requirements are read from the project's specifications and contract appendices. A clause from an unlicensed standard is cited and never reproduced.

Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.

Requirements

9

Mandatory

8

Suggested by the model

1

never verified on arrival

Accepted

6

In conflict

1

Clear
Requirements (3)
ReferenceRequirementSourceClass
REQ-S-3300-18
The test medium shall be filtered potable water with a chloride content of not more than 30 ppm.
ZRF-SPC-3300mandatoryAccepted
REQ-S-3300-22
The test pressure shall be held for not less than 2 hours with no visible leakage and no pressure loss.
ZRF-SPC-3300mandatoryAccepted
REQ-SUG-001
Consider recording ambient temperature at the start and end of the hold period, to explain a pressure change that is thermal rather than a leak.
ZRF-SPC-3300informativeSuggested

Showing 1 to 3 of 3 requirements