ZRF-ITP-0008 Inspection and Test Plan - Condensate Export Piping Supports
ITP for QUA, revision A, in review.
Why
The gaps, the people and the blockers are read from the project's own records. No section text is generated: no AI provider has been activated.
Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.
Gaps in the draft
A required input the project does not hold. The draft shows a gap where the content would be.
Every required input is present. That is not the same as the content being right.
What this rests on
The documents the draft is written from.
| Document | Title | Read |
|---|---|---|
| ZRF-SPC-3300 | Piping Material and Pressure Testing Specification | Read |
| ZRF-CTR-APX-D | Contract Appendix D - Quality and Inspection Requirements | Read |
Requirements this must satisfy
What the contract and the specifications ask of this deliverable.
| Reference | What it requires | |
|---|---|---|
| REQ-D-003 | An inspection and test plan shall be submitted for each work package, identifying every hold point and witness point. | Accepted |
Review comments
No comments have been raised.
Who is on it
- Author
- N. Okonkwo
- Checker
- A. Rahman
- Reviewer
- S. Lindqvist
- Approver
- R. Haddad
The author may not be the checker or the approver. Why
Raise a comment
No section text is generated