Menu

ZRF-PID-1101 metadata and traceability

The complete record for this document: what it is, how it was read, what it is worth, and what rests on it.

Demonstration project - no figure here describes a real facilityChanges are not saved
Why

Every field below is measured or recorded, not inferred. A field nothing establishes is shown as a gap rather than filled with a plausible value.

Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.

Identity

Document number
ZRF-PID-1101
Title
P&ID - Inlet Separation (scanned)
Class
pid
Discipline
PRO
Classification confidence
90%Unverified
Originator
Legacy drawing office

The file

Format
Scanned PDF, no text layer
Media type
application/pdf
Bytes
2,342,369
SHA-256
4594229b60f7d033872499abc355f3f8b2c67606854a5b6cf1b5f969e151b00c
Pages in the file
1
Pages as the document is held
1
Text layer
None: this file has to be read by OCR
Storage key
org/org-zemerc/project/project-zrf-lng/documents/ZRF-PID-1101/B.pdf

How it was read

Method
ocr
Processing state
processed
Extraction engine
eds-stroke-ocr
Engine version
0.1.0
Readings held
8
Highest confidence any reading reached
60%Unverified

The ceiling belongs to the method, not the document. Why

Verification and supersession

Current revision
B
Revisions held
1
Supersession chain
First issue only
Verification
Not verified against the sourceNo person has signed off the extracted content of this document
Findings against it
1 blocking, 0 warning, 0 information

References this document makes

None.

What rests on this document

The question somebody asks the moment a drawing is reissued.

Nothing on this project cites this document.

Recorded note

A scan. Carries PT-120I, the misreading-shaped variant of PT-1201 that the near-duplicate check must block.