Menu

ZRF-REG-CS-001 metadata and traceability

The complete record for this document: what it is, how it was read, what it is worth, and what rests on it.

Demonstration project - no figure here describes a real facilityChanges are not saved
Why

Every field below is measured or recorded, not inferred. A field nothing establishes is shown as a gap rather than filled with a plausible value.

Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.

Identity

Document number
ZRF-REG-CS-001
Title
Cable Schedule
Class
cable_schedule
Discipline
ELE
Classification confidence
95%Unverified
Originator
T. Adeyemi

The file

Format
Spreadsheet
Media type
application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
Bytes
4,118
SHA-256
526c8fd231bee788f87e54fdc6926046dcecac85e462ae1f6e46a4875f82e939
Pages in the file
Not a paginated format
Pages as the document is held
1
Text layer
Present
Storage key
org/org-zemerc/project/project-zrf-lng/documents/ZRF-REG-CS-001/B.xlsx

How it was read

Method
structured
Processing state
processed
Extraction engine
xlsx-reader
Engine version
0.1.0
Readings held
3
Highest confidence any reading reached
100%Unverified

The ceiling belongs to the method, not the document. Why

Verification and supersession

Current revision
B
Revisions held
1
Supersession chain
First issue only
Verification
Not verified against the sourceNo person has signed off the extracted content of this document
Findings against it
None

References this document makes

References from ZRF-REG-CS-001
DocumentHeld by the project
ZRF-SLD-6001Held

What rests on this document

The question somebody asks the moment a drawing is reissued.

Deliverables citing this document
DeliverableTitleState
ZRF-ETR-0004Electrical Test Report - Utilities MCCdraft