Document library
Every source document the project holds, with its current revision, how EDS read it, and how many tags it carries.
Why
Rows, counts, filters and sorting are computed from the project's document records and the files themselves.
Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.
Documents
25
Drawings
9
Registers
5
Read by EDS
22
Refused or not read
2
1 refused
| Numberascending | Title | Class | Rev | Read | |
|---|---|---|---|---|---|
| ZRF-CTR-APX-A | Contract Appendix A - Scope of Work | Contract appendix | 0 | Read | Open |
| ZRF-CTR-APX-D | Contract Appendix D - Quality and Inspection Requirements | Contract appendix | 0 | Read | Open |
| ZRF-DS-P-1201A | Equipment Datasheet - Condensate Export Pump P-1201A | Datasheet | B | Read | Open |
| ZRF-DS-PSV-1210 | Relief Device Datasheet - PSV-1210 | Datasheet | A | Read | Open |
| ZRF-DS-PT-1201 | Instrument Datasheet - Pressure Transmitter PT-1201 | Datasheet | A | Read | Open |
| ZRF-PFD-1100 | PFD - Inlet Reception | PFD | A | Read | Open |
| ZRF-PFD-1200 | PFD - Condensate Export | PFD | B | Read | Open |
| ZRF-PID-1101 | P&ID - Inlet Separation (scanned) | P&ID | B | Read | Open |
| ZRF-PID-1201 | P&ID - Condensate Export Pumps and Discharge | P&ID | C3 | Read | Open |
| ZRF-PID-1202 | P&ID - Condensate Export Metering | P&ID | B | Read | Open |
| ZRF-PID-3101 | P&ID - Cooling Water Circulation (mixed) | P&ID | A | Read | Open |
| ZRF-PID-3201 | P&ID - Instrument Air and Nitrogen | P&ID | A | Read | Open |
| ZRF-REG-CS-001 | Cable Schedule | Cable schedule | B | Read | Open |
| ZRF-REG-EQ-001 | Equipment Register | Equipment list | C1 | Read | Open |
| ZRF-REG-II-001 | Instrument Index | Instrument index | C1 | Read | Open |
| ZRF-REG-LL-001 | Piping Line List | Line list | C2 | Read | Open |
| ZRF-REG-MDR-001 | Master Document Register | Schedule | C3 | Read | Open |
| ZRF-REG-VR-001 | Valve Register | Valve register | C1 | Read | Open |
| ZRF-SCH-0001 | Project Schedule - Detailed Design and Construction | Schedule | C4 | Read | Open |
| ZRF-SLD-6001 | Single Line Diagram - Utilities MCC | Single line diagram | A | Read | Open |
| ZRF-SPC-3300 | Piping Material and Pressure Testing Specification | Specification | C1 | Read | Open |
| ZRF-SPC-4100 | Instrumentation and Control Specification | Specification | B | Read | Open |
Showing 1 to 22 of 22 documents
References the project cannot follow
ZRF-PID-1299 is named by a document the project holds and is not in the library. A continuation that leads nowhere is a gap in the drawing set, not a defect in the drawing that names it.
Refused is not the same as unread
A document EDS refused is one it measured as unreadable and declined to guess at. A document not read is one nothing has been attempted on. Both show zero tags, and treating them the same hides the only one of the two that needs a new file.
What a revision means here
The revision shown is the current one. Earlier revisions are kept and are reachable from each document, because an engineer who cites a drawing cites a revision of it, and a library that only holds the latest cannot tell them what has changed underneath.