Menu

LT-1110 Inlet separator level

instrument in U-11.

Not verified
Demonstration project - no figure here describes a real facilityChanges are not saved
Why

Each attribute carries the reading behind it. An attribute two documents dispute shows both rather than the more confident one.

Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.

Attributes

Attributes of LT-1110
AttributeValue
range0 to 1 800 mmUnverified
signal4-20 mAUnverified

Evidence

Every reading of this tag, with the parser and confidence behind it.

Evidence for LT-1110
ParserAs readConfidence
eds-stroke-ocrLT-111060%Unverified
xlsx-readerLT-1110100%Unverified

Documents

Documents mentioning LT-1110
DocumentTitle
ZRF-PID-1101P&ID - Inlet Separation (scanned)
ZRF-REG-II-001Instrument Index

Placement

Tag
LT-1110
Class
instrument
Discipline
INS
Unit
U-11
Subsystem
Not established
Test pack
Not assigned
Drawn on
ZRF-PID-1101

What this record rests on

Confidence
60%Unverified
Readings
2
Verified
Not yet

The weakest link in the chain, not an average. Why

What stops this being used

  • nothing machine-read is verified until a person has checked it

Verify this record

Verification is a person saying they checked this against the source. It is recorded against them.

Leave blank to verify the record rather than one value