Menu

PSH-1201 Condensate export high pressure switch

instrument in U-12, subsystem SYS-12-01.

Not verified
Demonstration project - no figure here describes a real facilityChanges are not saved
Why

Each attribute carries the reading behind it. An attribute two documents dispute shows both rather than the more confident one.

Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.

Attributes

Attributes of PSH-1201
AttributeValue
setpoint26 bargUnverified
actionTrip P-1201A/BUnverified

Evidence

Every reading of this tag, with the parser and confidence behind it.

Evidence for PSH-1201
ParserAs readConfidence
pdf-nativePSH-120180%Unverified
pdf-nativePSH-120180%Unverified
xlsx-readerPSH-1201100%Unverified

Documents

Documents mentioning PSH-1201
DocumentTitle
ZRF-PID-1201P&ID - Condensate Export Pumps and Discharge
ZRF-REG-II-001Instrument Index

Placement

Tag
PSH-1201
Class
instrument
Discipline
INS
Unit
U-12
Subsystem
SYS-12-01
Test pack
Not assigned
Drawn on
ZRF-PID-1201

What this record rests on

Confidence
80%Unverified
Readings
3
Verified
Not yet

The weakest link in the chain, not an average. Why

What stops this being used

  • nothing machine-read is verified until a person has checked it

Verify this record

Verification is a person saying they checked this against the source. It is recorded against them.

Leave blank to verify the record rather than one value