Menu

Requirements extraction

Every requirement the project has extracted, with its source, its classification and whether anybody has accepted it.

Demonstration project - no figure here describes a real facilityChanges are not saved
Why

Requirements are read from the project's specifications and contract appendices. A clause from an unlicensed standard is cited and never reproduced.

Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.

Requirements

9

Mandatory

8

Suggested by the model

1

never verified on arrival

Accepted

6

In conflict

1

Clear
Requirements (1)
ReferenceRequirementSourceClass
REQ-A-014
The hydrostatic test pressure shall be not less than 1.5 times the design pressure of the line under test.
ZRF-CTR-APX-AmandatoryAccepted

Showing 1 to 1 of 1 requirements

Page 1 of 1