Requirements extraction
Every requirement the project has extracted, with its source, its classification and whether anybody has accepted it.
Demonstration project - no figure here describes a real facilityChanges are not saved
Why
Requirements are read from the project's specifications and contract appendices. A clause from an unlicensed standard is cited and never reproduced.
Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.
Requirements
9
Mandatory
8
Suggested by the model
1
never verified on arrival
Accepted
6
In conflict
1
| Reference | Requirement | Source | Class | |
|---|---|---|---|---|
| REQ-D-003 | An inspection and test plan shall be submitted for each work package, identifying every hold point and witness point. | ZRF-CTR-APX-D | mandatory | Accepted |
| REQ-D-011 | Pressure testing shall be witnessed by the Company representative and the record signed before reinstatement. | ZRF-CTR-APX-D | mandatory | Not accepted |
Showing 1 to 2 of 2 requirements
Page 1 of 1