Document structure and contents
Proposed contents for the hydrotest procedure over SYS-12-01. Nothing is generated until you approve it.
Why
The outline and the gap against each section are derived from the checklist over the project's own records. A section whose input is missing is shown with the gap, rather than generated with a plausible value in it.
Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.
Proposed contents
- 1. Purpose and scope1 gap(s)
- 2. Referencesmandatory
- 3. Responsibilities1 input(s)
- 4. Test medium1 input(s)
- 5. Test parameters2 gap(s)
- 6. Procedure2 gap(s)
- 7. Recordsmandatory
- 8. Hold points1 input(s)
- 9. Acceptance criteria1 input(s)
Section 1 Purpose and scope
Intent: State the system and lines covered and the purpose of the test
Waiting on: Lines within the boundary
Generation will state the gap in place of the value, with its reason.
Mandatory sections come from the type
What generation will do
- Draft each section only from the evidence listed against it.
- Attach citations to every material statement.
- Insert the gap marker where evidence is missing, with the reason.
- Build the mandatory tables from the registers, not from prose.