Template selection
Which controlled template this deliverable is produced into. The template fixes branding, numbering, contents, cross-references and the issue sheet; it does not affect the engineering content.
Why
The template model, its controlled regions and its validation are implemented and run, over the project's own deliverable. No client template has been supplied, so conformance against one cannot be checked.
Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.
Available templates
Template contract: ZEMERC house template
- Issued by
- ZEMERC
- Page
- 595 x 842 pt
- Body text
- Helvetica 9.5 pt
- Numbering
- decimal
- Header
- ZRF-HTP-0015 Rev B
- Footer
- DRAFT - not issued Page 1 of 9
- Draft marking
- DRAFT
- Revision codes
- A, B, C, D, 1, 2, 3, 4
Precedents expose structure, not content
Template preview
Northern Gas - Procedure, Rev 3.
Meridian Engineering Partners
Hydrotest Procedure - Condensate Export System 12
- Document
- ZRF-HTP-0015
- Revision
- B
1. Purpose and scope
Section intent: state the systems and lines covered, and the purpose of the test.
2. References
Section intent: contract, specifications, procedures and drawings relied on.
3. Responsibilities
4. Test medium
5. Test parameters
Mandatory table: line number, size, design pressure, test pressure, duration.