Menu

ZRF-PID-3101 metadata and traceability

The complete record for this document: what it is, how it was read, what it is worth, and what rests on it.

Demonstration project - no figure here describes a real facilityChanges are not saved
Why

Every field below is measured or recorded, not inferred. A field nothing establishes is shown as a gap rather than filled with a plausible value.

Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.

Identity

Document number
ZRF-PID-3101
Title
P&ID - Cooling Water Circulation (mixed)
Class
pid
Discipline
PRO
Classification confidence
90%Unverified
Originator
N. Okonkwo

The file

Format
Mixed: vector frame with a scanned insert
Media type
application/pdf
Bytes
2,125,095
SHA-256
843bf1ed2c5c05edbcc5aa2aa73a345a6c1f5f2473408d84a8fe3ed2150cb33c
Pages in the file
1
Pages as the document is held
1
Text layer
Present
Storage key
org/org-zemerc/project/project-zrf-lng/documents/ZRF-PID-3101/A.pdf

How it was read

Method
both
Processing state
processed
Extraction engine
pdf-native+eds-stroke-ocr
Engine version
0.1.0
Readings held
8
Highest confidence any reading reached
70%Unverified

The ceiling belongs to the method, not the document. Why

Verification and supersession

Current revision
A
Revisions held
1
Supersession chain
First issue only
Verification
Not verified against the sourceNo person has signed off the extracted content of this document
Findings against it
1 blocking, 0 warning, 0 information

References this document makes

None.

What rests on this document

The question somebody asks the moment a drawing is reissued.

Deliverables citing this document
DeliverableTitleState
ZRF-CMP-0007Commissioning Procedure - Cooling Water System 31in check

Recorded note

The drawn boundary disagrees with the commissioning breakdown over HV-3101.