ZRF-SPC-3300 metadata and traceability
The complete record for this document: what it is, how it was read, what it is worth, and what rests on it.
Demonstration project - no figure here describes a real facilityChanges are not saved
Why
Every field below is measured or recorded, not inferred. A field nothing establishes is shown as a gap rather than filled with a plausible value.
Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.
Identity
- Document number
- ZRF-SPC-3300
- Title
- Piping Material and Pressure Testing Specification
- Class
- specification
- Discipline
- PIP
- Classification confidence
- 75%Unverified
- Originator
- N. Okonkwo
The file
- Format
- Text PDF
- Media type
- application/pdf
- Bytes
- 6,480
- SHA-256
- df451eb831658e691ab958a4dca9bd32059af33cca5538d212335b4fb84005b6
- Pages in the file
- 2
- Pages as the document is held
- 48 the file is a 2-page extract
- Text layer
- Present
- Storage key
- org/org-zemerc/project/project-zrf-lng/documents/ZRF-SPC-3300/C1.pdf
How it was read
- Method
- native_text
- Processing state
- processed
- Extraction engine
- Nothing has read this file
- Engine version
- Not applicable
- Readings held
- 0
- Highest confidence any reading reached
- No reading
The ceiling belongs to the method, not the document. Why
Verification and supersession
- Current revision
- C1
- Revisions held
- 1
- Supersession chain
- First issue only
- Verification
- Not verified against the sourceNo person has signed off the extracted content of this document
- Findings against it
- 0 blocking, 0 warning, 1 information
References this document makes
| Document | Held by the project |
|---|---|
| ISO 15649 | Not held |
What rests on this document
The question somebody asks the moment a drawing is reissued.
| Deliverable | Title | State |
|---|---|---|
| ZRF-HTP-0015 | Hydrotest Procedure - Condensate Export System 12 | in review |
| ZRF-ITP-0008 | Inspection and Test Plan - Condensate Export Piping Supports | in review |
| ZRF-ITP-0003 | Inspection and Test Plan - Piping Fabrication | approved |
| Requirement | Location | Classification |
|---|---|---|
| REQ-S-3300-18 | clause 18.3 | mandatory |
| REQ-S-3300-22 | clause 22.1 | mandatory |
| REQ-SUG-001 | clause 18 | informative |