Review and approval

Where every deliverable stands, who holds it, and what is outstanding on each.

Demonstration project - no figure here describes a real facilityChanges are not saved
Why

Stages, holders and outstanding comments are read from the project's own records.

Writes are validated against the engineering rules and then refused, because no database has been configured for this environment.

Deliverables

8

In check or review

3

Open comments

2

Blocking comments open

3

Approvals recorded

2

Checking is not reviewing

A checker verifies values, units and sources - they read for digits. A reviewer forms a technical opinion - they read for sense. Collapsing the two is the most common shortcut on a project under time pressure, and it is the one that lets a transcription error through.

Review position

Deliverables in the review cycle
DeliverableTitleStageWithOpen commentsOutstanding
ZRF-CMP-0007Commissioning Procedure - Cooling Water System 31in checkS. Lindqvist1
open gap: Commissioning sequence: the system boundary for SYS-31-01 is in dispute
ZRF-ETR-0004Electrical Test Report - Utilities MCCdraftT. Adeyemi0
open gap: Insulation test basis: the test voltage has not been confirmed
ZRF-HTP-0015Hydrotest Procedure - Condensate Export System 12in reviewS. Lindqvist3
open gap: Approved test pressure basis: the design pressure of P-1201A is in conflict between the datasheet and the line list
ZRF-ITP-0003Inspection and Test Plan - Piping FabricationapprovedR. Haddad0
Nothing
ZRF-ITP-0008Inspection and Test Plan - Condensate Export Piping Supportsin reviewS. Lindqvist0
Nothing
ZRF-LCR-0021Loop Check Record - PIC-1201draftM. Silva0
open gap: Functional test criteria: the control narrative has not been issued
ZRF-PEP-0001Project Execution PlanissuedR. Haddad0
open gap: Client document numbering requirements: Appendix F has not been received
ZRF-PEP-0001-RAProject Execution PlansupersededR. Haddad0
Nothing

Approvals recorded

Approvals
DeliverableApproved byWhenIndependent checkStatement
ZRF-ITP-0003R. Haddad2026-10-18Ran
Checked by A. Rahman, reviewed by S. Lindqvist, no blocking findings outstanding.
ZRF-PEP-0001R. Haddad2026-05-04Ran
Reviewed by the Company representative; Appendix F gap recorded and accepted.

The four stages

Author
Writes it, and may not check or approve it.
Checker
Verifies values, units and sources against the documents.
Reviewer
Forms a technical opinion and raises comments. Only they can close one.
Approver
Takes responsibility for issue. An explicit capability, never inherited.

Who can approve

  • R. HaddadPRO